Information Portal

PROJECT “ROZINO”

250+ new
jobs

250+ million euro investment

What is the project about?

Project “Rozino” is an opportunity for Ivaylovgrad to gain more jobs, more economic activity, and a more realistic perspective for the future. The investment proposal is for the extraction and processing of polymetallic ores through open-pit mining, but its significance is not limited only to the boundaries of the site itself. For a small municipality, the true value of such a project lies in how much it can revive the entire local community — through new employment, more opportunities for local businesses, services, supplies, transport, construction, and greater security for families in the area.

The project is important not only economically, but also socially.

In a region that has for years faced depopulation, limited job opportunities, and an outflow of young people, every serious investment must be assessed responsibly and on its merits. That is exactly why Project “Rozino” is undergoing a full Environmental Impact Assessment procedure, examining water, air, noise, human health, risks, mitigation measures, and subsequent reclamation. If it is implemented as presented in the documents — under strict rules, constant monitoring, and real control — the project can become not just an industrial site, but an opportunity for more life, work, and future for Ivaylovgrad.

Location

The land of the village of Rozino, located 50 km from the town of Ivaylovgrad

Nature of the Project

Extraction and processing of polymetallic ores through open-pit mining

Procedures and Control

The project is at the stage of approval of the Environmental Impact Assessment Report.

About Us

“Information Portal – Project Rozino” was created with the aim of providing clear, accessible, and objective information about Project “Rozino” and its significance for the municipality of Ivaylovgrad and the region.

Here we gather in one place basic facts, documents, explanations, and publicly significant information related to the project, the legal procedures, and the topics that concern the local community.

We believe that on important issues for the region, people should have access to timely, understandable, and verifiable information. Therefore, the purpose of this portal is to support an informed public conversation through more clarity, more facts, and better organization of information.

Myths and Facts about Project Rozino

MYTH 1: Open-pit mining is planned for a period of 35 years

FACT:
This claim is misleading. The 35 years is the term of the concession agreement under the Underground Resources Act, but the planned development of the calculated reserves is approximately 10 years, i.e. the actual planned operating period is around 10 years, including construction, mining activities, and reclamation.

MYTH 2: Mining activities cannot be carried out in Natura 2000 protected zones

FACT:
The Protected Areas Act does not contain an explicit prohibition on carrying out mining activities in protected zones when an environmental impact assessment has been conducted. Therefore, the claim that such activities are absolutely inadmissible is false.

MYTH 3: Water resources in the area are limited

FACT:
The issue of water resources has not been left unresolved, but has been placed among the main topics in the EIA report. Extremely strict measures are envisaged to prevent water shortages, the leading one being the recycling of used water. This is a clear sign that the project has been developed with a specific focus on the protection and sustainable management of water resources.

MYTH 4: The village of Rozino will be left without water for drinking and household needs

FACT:
The claim that the village of Rozino will be left without water for drinking and household needs is false. The village is supplied with water from a catchment source, not from the watershed of Arpa Dere, from which water abstraction for the project is planned. Therefore, it is not the same water source.

MYTH 5: There will be drying up of the Byala River

FACT:
The claim that the project will lead to the drying up of the Byala River is false. The project does not envisage water abstraction from the Byala River, but from Arpa Dere, and only during periods of high water. The planned quantities are designed in such a way that the ecological water balance of the stream is preserved, which rules out the suggestion of the drying up of the Byala River.

MYTH 6: There will be pollution of the Byala River with hazardous chemicals

FACT:
The claim that the Byala River will be polluted with hazardous chemicals is false. The classification and categorization of the substances and mixtures used in the production process under the Environmental Protection Act clearly show that the site does not fall into the category of an enterprise or facility with accident hazard potential.This means zero danger of pollution of the Byala River.

MYTH 7: The Erythropotamos River in Greece will be dried up and polluted

FACT:
The claim that the project will lead to the drying up and pollution of the Erythropotamos River is false. The project does not envisage water abstraction from the Byala River, and in addition zero discharge of contact waters from the mining waste facility is envisaged. This excludes the possibility of pollution or drying up of the Erythropotamos River

MYTH 8: There is a risk to the cultural and historical heritage

FACT:
According to the register of the National Archaeological Institute with Museum at the Bulgarian Academy of Sciences, no cultural and historical sites have been identified within the scope of the investment proposal. Nevertheless, as an additional guarantee, an archaeological survey of the territory of the investment proposal is envisaged before the start of construction of the mining complex.

MYTH 9: The project creates a risk to local livelihoods

FACT:
As a result of the planned activities under the investment proposal, no risk of pollution of water, soil, and air has been identified. On the contrary, the project creates an opportunity for real benefits for the local population through new jobs, development of sustainable businesses related to the project, and significant improvement of the local infrastructure. The concession payment due under the project is divided proportionally between the state and municipal budgets. In practice, this means secure revenue directly for the municipality of Ivaylovgrad for the years of development, which will raise the standard and quality of life in the region.

MYTH 10: There will be contamination of soils and groundwater with acid drainage

FACT:
All mining facilities, including those for mining waste, are designed with maximum protection against the leakage of pollutants into the soil layer. In addition, it has been proven that the stored waste is acid-neutral and there is no danger of acid contamination.

MYTH 11: The project will lead to air pollution

FACT:
The control of dust emissions from blasting and transport activities is examined in detail in the EIA report, and a number of measures are envisaged to limit it, including specialized coverings during blasting operations and constant watering of the mine roads.

MYTH 12: The project will endanger the long-term public interest

FACT:
On the contrary, the project is associated with specific long-term benefits for the municipality of Ivaylovgrad. During its implementation, the creation of over 250 permanent jobs is envisaged, and the related activities will be assigned with priority to local subcontractors. The creation of a Fund to support local business is also envisaged, following the example of Krumovgrad, which will finance business initiatives and support the sustainable development of the local community even after the closure of the mine.

MYTH 13: After the closure of the mine, a “moon landscape” will remain

FACT:
This suggestion is false. After the end of mining activities, the land is not intended to be abandoned; on the contrary — significant funds have been allocated for the full reclamation of the affected areas. In addition, ideas and projects for their subsequent improvement are being discussed, which shows that a clear approach to the restoration of the land after the end of the activities has already been envisaged at this stage.

MYTH 14: There is arsenic and mercury in the mine area

FACT:
Arsenic and mercury are not “added” substances, but natural elements that occur in the Earth’s crust and are often associated with ore minerals. Their mere presence does not automatically mean risk. The real risk depends on the chemical form in which they are found, in what concentration they are present, and under what conditions they may have an impact. In the case of the “Rozino” deposit, arsenic and mercury are associated with the natural geochemical conditions of the gold mineralization and represent insignificant inclusions in the main mineral — pyrite. During flotation, this pyrite, together with the components included in it (gold, silver, copper, zinc, arsenic, mercury content practically absent), is extracted at over 90% into the pyrite concentrate.

MYTH 15: Cyanides will be used

FACT:
The project категорично does not envisage the use of cyanides. The planned method for extracting the useful component from the ore is flotation, with pyrite concentrate as the final product, and cyanidation is excluded as a method for processing the concentrate within the scope of the investment proposal.